亚洲91视频,国产91网,久久久久久久久久久久久久久国产,亚洲一区二区三区日本久久九,亚洲日本久久,国产精品久久久99,亚洲欧美一区二

New ultra-high voltage project begins operation to deliver power from Xinjiang to Chongqing

Xinhua | Updated: 2025-06-10 13:37
Share
Share - WeChat
An aerial drone photo shows a photovoltaic and wind farm as part of the Hami-Chongqing ±800 kV ultra-high voltage direct current transmission project, in Hami, Northwest China's Xinjiang Uygur autonomous region, March 23, 2025. [Photo/Xinhua]

Transmitting 100 million kilowatts of photovoltaic power from Xinjiang to the eastern and central regions of China would cut back on thermal power installations in those areas by 25 million kilowatts, according to calculations by State Grid Xinjiang Electric Power Co, Ltd.

China has committed to a dual goal of peaking carbon emissions by 2030 and achieving carbon neutrality by 2060. In 2024, 86 percent of newly installed power capacity in China came from renewable energy sources, while the share of cumulative installed renewable capacity rose to a record high of 56 percent of the national total, official data showed.

|<< Previous 1 2 3 4 5   
Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US