亚洲91视频,国产91网,久久久久久久久久久久久久久国产,亚洲一区二区三区日本久久九,亚洲日本久久,国产精品久久久99,亚洲欧美一区二

 
 

Home/Our Business/Municipal Projects

Jila Dike Lengshuichong Drainage Pump Station Project (China)

Updated: 2014-03-19

With a length of 2,609m and a protection area of 4.32 km2, Jila Dike is designed to protect 88,100 people and its design criterion for flood control is 50 years. The dike is equipped with three drainage pump stations with the installed capacity of 4,680kw. Located in the middle of Jila Dike, the Lengshuichong drainage pump station is equipped with eight pumps, with a total installed capacity of 2,640kw and design pump flow of 248 m3 per second.

Jila Dike Lengshuichong Drainage Pump Station Project (China)
Jila Dike Lengshuichong Drainage Pump Station Project

Jila Dike Lengshuichong Drainage Pump Station Project (China)
Jila Dike Lengshuichong Drainage Pump Station Project

 

Related articles
 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.