亚洲91视频,国产91网,久久久久久久久久久久久久久国产,亚洲一区二区三区日本久久九,亚洲日本久久,国产精品久久久99,亚洲欧美一区二

 
 

Home/Our Business/Equipment Installation

Electromechanical Equipment Installation at the Geheyan Hydropower Station (China)

Updated: 2014-04-01

CGGC is the prime contractor for the four generator units at the Geheyan Hydropower Station, each having a single-unit capacity of 300MW.

Electromechanical Equipment Installation at the Geheyan Hydropower Station (China)

Electromechanical Equipment Installation at the Geheyan Hydropower Station

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.