亚洲91视频,国产91网,久久久久久久久久久久久久久国产,亚洲一区二区三区日本久久九,亚洲日本久久,国产精品久久久99,亚洲欧美一区二

Home|Contact|Members|中文|
Search
Home > News

Ghana president at Bui hydro-station opening

Updated: 2013-12-31

The Bui hydropower station, the country of Ghana's second largest hydropower station, and designed and built entirely by POWERCHINA, was completed on Dec 19, 2013, with three generators in operation. The president of Ghana, Mahama was on hand for the ceremony.

Ghana president at Bui hydro-station opening
 

The station is on the Volta River, 15 km upstream from Lake Volta in the northern part of Ghana, near the Ivory Coast border, and has a total installed capacity of 400 MW. The project had a total cost of $700 million, with the EXIM Bank of China providing 560 million.

Ghana president at Bui hydro-station opening
 

The project is expected to generate about 1 billion kWh annually, or a sixth of the nation's electricity needs, playing an important part in social and economic development in Ghana and western Africa.