亚洲91视频,国产91网,久久久久久久久久久久久久久国产,亚洲一区二区三区日本久久九,亚洲日本久久,国产精品久久久99,亚洲欧美一区二

US EUROPE AFRICA ASIA 中文
Business / Biz Photos

Beijing water plant ready for water diversion project

Updated: 2014-10-30 11:10 (Xinhua)
Comments

Beijing water plant ready for water diversion project

Zhang Zhouqiang, director of engineering department of the construction office of Guogongzhuang Water Plant, introduces water quality monitoring system at Guogongzhuang Water Plant in Beijing, capital of China, Oct 24, 2014. The Guogongzhuang Water Plant has passed a test run and is able to purify water that will be transferred to Beijing via the south-to-north water diversion project. The water plant, located in south Beijing, is the first major water plant built by the city in the downtown area for the project since 2000. It is expected to provide 500,000 cubic meters of water daily to meet the demand of nearly five million residents of Beijing. [Photo/Xinhua]

Previous Page 1 2 3 4 5 6 7 8 Next Page

Photo
8.03K
...
...